Solar array at golden hour beside a data center

SunBrand · Direct to you

Power and compute, packaged like a product.

HPC AI servers and complete hybrid solar plants — configured, crated, and checked out in a few clicks.

4× / 8×GPU compute nodes
10–50 kWComplete solar plants
710 WLi-Pen modules
12 kWHybrid inverters
Complete packagesEvery crate ships ready to commission
Guest checkoutName, email, ship-to. No account
Deposit or fullDeposit starts the build
Secure by designCard numbers never touch our servers

Helios

HPC AI compute servers

Four- and eight-way nodes. Pick from five enterprise accelerators, and the memory, fabric, and rack power follow.

All Helios
Helios nodes racked in a compute hall

Why buy the node, not the parts

A parts list is not a system.

Anyone can quote you eight accelerators. Helios ships as one commissioned machine: the CPUs, the memory, the NVMe, the fabric, the redundant supplies, and the rack PDU that carries it — matched, burned in, and covered under one warranty.

Solstice

Complete solar plants

710 W Li-Pen modules and 12 kW hybrid inverters, crated as one order with the balance of system.

All Solstice
Close view of a 710 W monocrystalline module

In every Solstice crate

710 W modules. 12 kW hybrids.

Panel count scales with the plant you pick; the engineering does not change. Each package pairs Li-Pen monocrystalline modules with 12 kW hybrid inverters, then adds the mount, combiners, protection, and monitoring so the crate is complete when it lands.

  • Inverter headroom over array DC, not a tight match
  • Roof rail or ground-mount hardware included
  • Optional lithium storage configured at purchase
  • Anything past 50 kW gets a written proposal

How you buy

Three honest steps.

Start configuring
  1. Configure

    Pick a Helios node or a Solstice plant and set the few options that genuinely change the crate.

  2. Add to cart

    No account, no sales gate. Every price is recomputed on the server before it is charged.

  3. Deposit or pay in full

    A deposit starts the build. Freight is a hold until we confirm the lane.

Utility-scale solar campus at sunset

Call for larger

Need a hall, not a kit?

Multi-node clusters and 100 kW+ plants start with a short note. Interconnection, structure, and storage all change the bill of materials — so we write it down instead of guessing in a cart.